Package Execution Quotes

06/01/2020

FINISHING UNIT

 


VND 5,200,000 / m2

 


MATERIALS USED

Commit to using genuine materials, and in accordance with the contract. Absolutely do not put fake materials, poor quality materials into the construction work.

Covering inspection, testing, accepting a fine of VND 50 million if the Investor finds the company in violation. Submit sample of materials before construction.

 


1. IRON - STEEL:

- VIETNAM - JAPAN

- POMINA

2. Cement

- HOLCIM

- HA TIEN

3. TUYNEL BRICK

- DAWN

- DEVOTION

4. AN CHEMICALS

- STONE 10x20

(For concrete)

- HA 40x60

(Give five nails)

5. CONCRETE

- MAC BT by design.

- C250 with the ratio: 1 Xi + 4 Sand + 6 Stone. 18L barrel

6. WATER PIPES

- DAWN

- ACCORDING TO STANDARDS

7. ELECTRIC WIRE

- CADIVI

- ACCORDING TO STANDARDS

8. WATERPROOFING

- SIKA LATEX

- FLINKOTE

9. TILE - TOLE

- HOA SEN

- THAILAND